Can we release this package?

The question at a release meeting is usually simple: can we release this package, and what is holding it up?

Fit-Out Coordination Review is prepared around that question. Before a fabrication or installation release (millwork, fixtures, a ceiling), we scan the zone and return a marked record the release meeting can use.

You receive a scaled DXF elevation of one zone, a marked PDF for the meeting, and an issue list with photo crops: fits, conflicts, and items still to verify on site. Sections through visible conflicts are available on request. Every dimension is measured, with its ± tolerance stated, for reference only, and critical dimensions should still be confirmed on site. The aim is a reviewed set of findings the shop and the site team can act on, not raw scan data.

In a 2018 industry survey of construction leaders, mostly in the United States, respondents attributed nearly half of rework to poor project data and miscommunication (FMI/PlanGrid).

Our founder spent over ten years in commercial architectural millwork, drafting and site coordination. We know how a designer’s detail becomes a shop drawing, and how a fabricator reads a field dimension.

Fit-out also sits at a useful point in the life of a space. A Fit-Out Readiness Pack, prepared between tenants, gives the incoming tenant’s designer and GC a documented starting point, and can lead directly into a Fit-Out Coordination Review once the work is on site.

Tell us about the zone and the stage of the job: info@builtspatial.com or (905) 751-8858.

Sources

FMI/PlanGrid industry survey, 2018: https://www.autodesk.com/blogs/construction/construction-disconnected-fmi-report/