A commercial unit between tenants is a short window, and an easy one to leave undocumented.
In downtown Toronto, built-out space made up about three-quarters of office leasing activity in the third quarter of 2026 (CBRE). Many incoming tenants are taking space that already has a fit-out.
At move-out and move-in, condition is often recorded in notes, a walkthrough, and a handful of photos. Those files are hard to share with the next tenant’s designer, and harder still to reuse when the fit-out starts.
A Unit Turnover Record is a dated 3D virtual tour, a condition notes PDF with photo references, and a floor plan. It gives the property manager a clear record of the unit at each change of tenant.
Between tenants, when a unit is marketed or prepared for the next fit-out, a Fit-Out Readiness Pack goes further. The incoming tenant’s designer and GC receive an existing conditions plan as DXF and PDF, an E57 point cloud, a 3D virtual tour, and a constraints sheet covering the column grid, clear heights, visible services and shutoffs, and demising walls.
That pack is the bridge into the next job, and can become the existing conditions record for the incoming fit-out. The same building may also need a Building Baseline of common areas, lobbies and service rooms.
Tell us about a unit turnover or an upcoming fit-out: info@builtspatial.com or (905) 751-8858.
Sources
CBRE, 2026: https://www.cbre.ca/insights/figures/toronto-downtown-office-figures-q3-2026